PCB Supplier

Quick-Turn

Hit the dial for the speed your schedule actually needs.

Four published quick-turn tiers — from 24-hour bare board to 5-day full PCBA. DFM review bundled, courier handoff in Shenzhen same-day. No surprise “expedite fees.”

Bare-board
24h
Turnkey
3d
Full PCBA
5d
Expedite fees
0

How the clock runs

The hours that count, and the ones that don’t

Published turn-time starts when DFM is clean and payment is logged — not when you hit “submit.” We protect you from false promises.

STEP 1 · T+0 h
Order received

DFM engineer starts review within 30 min (office hours).

STEP 2 · T+2 h
DFM signed off

Any blockers resolved with your engineer before the clock starts.

STEP 3 · T+4 h
Production starts

Board cut, inner layers exposed, or SMT line loaded.

STEP 4 · T+24 h
Ex-works

QC sign-off, AOI report, courier pickup all same day.

What makes it possible

Four things most shops don’t have

Quick-turn isn’t an expedite queue — it’s a separate production path with reserved capacity, same-day DFM, stocked materials, and a logistics handoff that doesn’t wait for tomorrow’s pickup.

  • Dedicated quick-turn line — never queued
  • Engineer on call for DFM ≤ 2 h
  • 48-hour stock of FR-4 core (4 thicknesses)
  • 2,500-SKU SMT component bond
  • SF Express & DHL in-factory counter
  • Night-shift AOI & QA (18:00–06:00)
  • Online tracker for every order state
  • No expedite surcharge inside tier

Published Tiers

Turn-time vs. what you can include

Quick-Turn Capability Matrix
24-hour · bare board
Layers1 – 2 layer FR-4
Max size300 × 400 mm per panel
FinishHASL standard · ENIG next-day
Min order1 panel
48-hour · bare board
Layers4 layer rigid FR-4
Via typePTH · 0.25 mm drill
Impedance control±10% (single-ended) · next tier for tighter
3-day · turnkey PCBA
Board2–4L FR-4 from partner queue
BOMMust match stocked catalog
AssemblySMT only · 1 side
5-day · full PCBA
BoardAny 2–6L rigid · aluminum OK
BOMUp to 200 unique refs · long-lead handled separately
AssemblySMT + THT · double-sided
TestingAOI + ICT + functional on request
All tiers
DFM reviewBundled · 2-hour turnaround
QA documentsAOI report + FAI checklist
LogisticsSF Express / DHL / FedEx in-factory handoff

Door to door

Shenzhen ex-works to your bench, in days

China domestic
1–2 days
SF Express
USA / Canada
3–4 days
DHL · FedEx Int’l Priority
Europe
3–5 days
DHL Express · UPS WWS
Asia-Pacific
2–4 days
SF International · DHL

Frequently Asked Questions

Quick-turn FAQ

Ask a specialist
01Is there an expedite surcharge inside a tier?

No. The 24-hour price is the 24-hour price — no last-minute “rush fees.” Tier pricing is published at quote time and doesn’t change as the clock runs.

02What happens if DFM finds an issue?

The clock pauses. We flag the issue within 2 hours, wait for your sign-off, then restart from T+0. You never lose tier pricing because of a DFM exchange.

03Can you do 24-hour on a 4-layer board?

Not reliably as a published tier — 4-layer is our 48-hour lane. We occasionally hit 30 hours on 4L when the queue is open, but we won’t publish it.

04Can I ship quick-turn builds direct to my customer?

Yes — we do blind drop-ship from Shenzhen. No Venture Electronics paperwork in the shipment, your documents on the carton. Used daily by US / EU distributors.

Ready when you are

Send your Gerber & BOM — get a quote in 24 hours.

NDA available · Free DFM review · Senior engineer response.